A platform for research: civil engineering, architecture and urbanism
Serious settlement of north abutment of bridge near Chesapeake City, Md, demanded immediate action; description of underpinning; bridge consists of two approach spans, each 195 ft long, and vertical center lift span 210 ft long; north abutment consists of two concrete shafts.
Serious settlement of north abutment of bridge near Chesapeake City, Md, demanded immediate action; description of underpinning; bridge consists of two approach spans, each 195 ft long, and vertical center lift span 210 ft long; north abutment consists of two concrete shafts.
Army engineers save summit bridge
Civ Eng (NY)
French, F.F. (author)
1949
4 pages
Photographs
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1939
|Bridge building by Canadian army engineers in Europe
Engineering Index Backfile | 1946
|Army engineers build new highway bridge across potomac
Engineering Index Backfile | 1920
Bridge-erecting crane trucks speed pontoon construction by army engineers
Engineering Index Backfile | 1944
Sign up to the upcoming Tunnelling Summit and save GBP 100
British Library Online Contents | 2014