A platform for research: civil engineering, architecture and urbanism
Tunnel construction at mount little Joe
Tunnel being constructed by Melbourne and Metropolitan Board of Works, as part of 25-mi conduit to convey 75 mgd from existing Upper Yarra aqueduct at Starvation creek to Silvan reservoir; tunnel being driven from both ends, and will be 6200 ft long; ground support; drilling and blasting; ventilation; mechanical shovel loading of broken rock; Diesel locomotive haulage.
Tunnel construction at mount little Joe
Tunnel being constructed by Melbourne and Metropolitan Board of Works, as part of 25-mi conduit to convey 75 mgd from existing Upper Yarra aqueduct at Starvation creek to Silvan reservoir; tunnel being driven from both ends, and will be 6200 ft long; ground support; drilling and blasting; ventilation; mechanical shovel loading of broken rock; Diesel locomotive haulage.
Tunnel construction at mount little Joe
Chem Eng Min Rev
1948
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction risks of Huaying mount tunnel and countermeasures
Springer Verlag | 2017
|Concept and construction of the Mount Baker Ridge Tunnel
British Library Online Contents | 1992
|Engineering Index Backfile | 1919
|Engineering Index Backfile | 1917
|Mount Victoria tunnel ventilation
Engineering Index Backfile | 1932
|