A platform for research: civil engineering, architecture and urbanism
Progress of work on Brooklyn-Battery Tunnel indicates early completion date
Completion of 70% of construction reported; present work consists of calking 31-ft-diam segmented cast iron rings of twin tubes, pouring concrete lining, constructing roadways and installing utilities; to house tunnel ventilating equipment, harbor has been dredged to hardpan as first step in building island in East River; typical construction stages illustrated.
Progress of work on Brooklyn-Battery Tunnel indicates early completion date
Completion of 70% of construction reported; present work consists of calking 31-ft-diam segmented cast iron rings of twin tubes, pouring concrete lining, constructing roadways and installing utilities; to house tunnel ventilating equipment, harbor has been dredged to hardpan as first step in building island in East River; typical construction stages illustrated.
Progress of work on Brooklyn-Battery Tunnel indicates early completion date
Civ Eng (NY)
1948
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Electrifying brooklyn battery tunnel
Engineering Index Backfile | 1950
|Progress of work at Brooklyn Bridge, June, 1879
Engineering Index Backfile | 1880
|Brooklyn, Wellington NEW WORK STUDIO
British Library Online Contents | 2004
The 14th ave Sewer and 60th St. Sewer Tunnel Work, Brooklyn, N. Y.
Engineering Index Backfile | 1901
Tunnel grouting in Brooklyn end of Catskill Aqueduct
Engineering Index Backfile | 1916
|