A platform for research: civil engineering, architecture and urbanism
Longest tunnel in United States is continuously lighted by slimline fluorescent lamps enclosed by Pyrex carriers; tiled walls hide extensive wiring for power, light, signaling and communications; fresh air introduced to roadway area through curb line vents and exhausted through ceiling openings; contracts totaling $8,000, 000, covering supply and installation of wiring, switchgear, lighting and electric equipment, were of major importance in its completion.
Longest tunnel in United States is continuously lighted by slimline fluorescent lamps enclosed by Pyrex carriers; tiled walls hide extensive wiring for power, light, signaling and communications; fresh air introduced to roadway area through curb line vents and exhausted through ceiling openings; contracts totaling $8,000, 000, covering supply and installation of wiring, switchgear, lighting and electric equipment, were of major importance in its completion.
Electrifying brooklyn battery tunnel
Elec Construction Maintenance
Scott, H.P. (author)
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Progress of work on Brooklyn-Battery Tunnel indicates early completion date
Engineering Index Backfile | 1948
Electrifying Organic Synthesis
Wiley | 2022
|Online Contents | 2011
Electrifying life-saving Beacons
IEEE | 1924
Electrifying the Enlightenment
Taylor & Francis Verlag | 2010
|