A platform for research: civil engineering, architecture and urbanism
Building 27-mile timber-limit service road through swamp and soupy clay
Description of gravel surfaced freight road built for power and paper company in Northern Ontario; unusual difficulties in swamp areas necessitated employment of corduroy work; data on mechanical equipment, gravel supply and labor problems; over 13 mi of drainage ditches were also required, which were constructed by blasting using propagation method.
Building 27-mile timber-limit service road through swamp and soupy clay
Description of gravel surfaced freight road built for power and paper company in Northern Ontario; unusual difficulties in swamp areas necessitated employment of corduroy work; data on mechanical equipment, gravel supply and labor problems; over 13 mi of drainage ditches were also required, which were constructed by blasting using propagation method.
Building 27-mile timber-limit service road through swamp and soupy clay
Roads Bridges
McDougall, C.G. (author)
Roads and Bridges ; 86
1948
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Four-mile causeway carries state road over swamp
Engineering Index Backfile | 1924
|Sewer laid through swamp on timber grillage
Engineering Index Backfile | 1945
|Engineering Index Backfile | 1928
|Swamp road building among the Indiana sand dunes
Engineering Index Backfile | 1924
|Sunken road across swamp bridged by treated timber deck on concrete-capped wood piling
Engineering Index Backfile | 1932