A platform for research: civil engineering, architecture and urbanism
Four-mile causeway carries state road over swamp
A causeway, alternately of embankment and concrete trestle, takes road in South Carolina 4 1/2 miles over Santee River. Railway methods and equipment used in construction. Flood conditions add year to construction time.
Four-mile causeway carries state road over swamp
A causeway, alternately of embankment and concrete trestle, takes road in South Carolina 4 1/2 miles over Santee River. Railway methods and equipment used in construction. Flood conditions add year to construction time.
Four-mile causeway carries state road over swamp
Eng. News-Rec
Pinnell, J. (author) / Parker, J.L. (author)
1924
4 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building 13-mile causeway across sea of salt
Engineering Index Backfile | 1958
|Hydraulic fill causeway replaces floating road
Engineering Index Backfile | 1945
Building 27-mile timber-limit service road through swamp and soupy clay
Engineering Index Backfile | 1948
|Engineering Index Backfile | 1945