A platform for research: civil engineering, architecture and urbanism
Rock fill diverts River at Davis Dam
Report on diversion of Colorado River as preliminary step to construction of Davis Dam; entire filling operation accomplished in 56 hr; some 29,000 cu yd of rock placed during this period.
Rock fill diverts River at Davis Dam
Report on diversion of Colorado River as preliminary step to construction of Davis Dam; entire filling operation accomplished in 56 hr; some 29,000 cu yd of rock placed during this period.
Rock fill diverts River at Davis Dam
Eng News-Rec
Engineering News-Record ; 141
1948
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
"Cascade closure" diverts river
Engineering Index Backfile | 1962
|Michigan diverts river to reroute road
Engineering Index Backfile | 1931
|Kiewit diverts creek from new highway
Engineering Index Backfile | 1958
Overflow-type dam diverts water to city
Engineering Index Backfile | 1951
Recycling Program Diverts Debris from Earthquake Cleanup
Online Contents | 1995
|