Columbia basin -- Bacon tunnel construction progress
Driving of 1.9 mi-tunnel, major structure of main canal from Grand Coulee dam, is nearly completed with progress steady at 20 ft per 24 hr on full face operations; typical construction stages illustrated showing employment of mechanical equipment.
Columbia basin -- Bacon tunnel construction progress
Driving of 1.9 mi-tunnel, major structure of main canal from Grand Coulee dam, is nearly completed with progress steady at 20 ft per 24 hr on full face operations; typical construction stages illustrated showing employment of mechanical equipment.
Columbia basin -- Bacon tunnel construction progress
Western Construction News
1948
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction begins on Columbia Basin canal system
Engineering Index Backfile | 1946
|Engineering Index Backfile | 1916
|Engineering Index Backfile | 1936
|Engineering Index Backfile | 1952
|