A platform for research: civil engineering, architecture and urbanism
Streamlined construction on Houston interurban expressway
Expressway, totaling 3.6 mi, consists of two 36-ft roadways divided by 4-ft center strip and flanked by 10-ft emergency parking strip; embankment fill is compacted 100% Proctor, then sides and top of fill are given asphalt treatment; most overpass structu over-bar res are uniform spans of 49 1/2 ft made up of concrete columns, cap and 36-in. rolled beams; typical stages of work illustrated.
Streamlined construction on Houston interurban expressway
Expressway, totaling 3.6 mi, consists of two 36-ft roadways divided by 4-ft center strip and flanked by 10-ft emergency parking strip; embankment fill is compacted 100% Proctor, then sides and top of fill are given asphalt treatment; most overpass structu over-bar res are uniform spans of 49 1/2 ft made up of concrete columns, cap and 36-in. rolled beams; typical stages of work illustrated.
Streamlined construction on Houston interurban expressway
Construction Methods
Construction Methods ; 30
1948
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1948
Progress on expressway construction in American cities -- Houston
Engineering Index Backfile | 1948
|Concrete in interurban track construction
Engineering Index Backfile | 1916
|Staging interurban highway construction by dynamic programming
Online Contents | 1974
|Engineering Index Backfile | 1903