A platform for research: civil engineering, architecture and urbanism
Highline methods
Transport of material and personnel for construction of highway bridge over Columbia River at Northport, Wash, was performed by cableway between 155 ft high head tower and 100 ft high tail tower, 190 ft apart; main cable was 1 3/4 in.; bridge with total length of 1104 ft is supported on 3 bents and 4 piers of reinforced concrete and steel; data on falsework, materials, concrete mixing plant and concrete placing.
Highline methods
Transport of material and personnel for construction of highway bridge over Columbia River at Northport, Wash, was performed by cableway between 155 ft high head tower and 100 ft high tail tower, 190 ft apart; main cable was 1 3/4 in.; bridge with total length of 1104 ft is supported on 3 bents and 4 piers of reinforced concrete and steel; data on falsework, materials, concrete mixing plant and concrete placing.
Highline methods
Pac Bldr Engr
1948
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2002
ASCE | 2019
|Highline erects Arizona bridge
Engineering Index Backfile | 1965
New York Umnutzung der Highline
British Library Online Contents | 2004
Bildgeschichte - Highline-Park in New York
Online Contents | 2009