A platform for research: civil engineering, architecture and urbanism
On-the-ground welded fabrication of studding speeds construction of all-steel three-story office building
Method of prefabricating of studding in 10-ft panels, in assembly and erection of building for WKM Valve Co, Houston, Tex; studs are light weight, lattice web, 1-piece members, with minimum steel thickness of 1/8 in.; fabricated on light load structure building principle, studs are claimed to support safe load of 6000 lb when braced laterally.
On-the-ground welded fabrication of studding speeds construction of all-steel three-story office building
Method of prefabricating of studding in 10-ft panels, in assembly and erection of building for WKM Valve Co, Houston, Tex; studs are light weight, lattice web, 1-piece members, with minimum steel thickness of 1/8 in.; fabricated on light load structure building principle, studs are claimed to support safe load of 6000 lb when braced laterally.
On-the-ground welded fabrication of studding speeds construction of all-steel three-story office building
Welding J
Newton, R.H. (author)
Welding Journal ; 26
1947
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Arc welding speeds construction of office building
Engineering Index Backfile | 1965
|A field-welded steel frame office building
Engineering Index Backfile | 1929
|Construction of 20-story office building in Vienna
Engineering Index Backfile | 1955
|The erection of a Five story Office Building in Composite Steel Construction
British Library Online Contents | 1996
|All-welded multi-story building
Engineering Index Backfile | 1938
|