A platform for research: civil engineering, architecture and urbanism
Arc welding speeds construction of office building
It is shown how savings in cost and construction time were obtained in recently completed office building by use of arc-welded and composite structural members as compared with all-bolted and non-composite construction; medium-size, three-story building was designed and built within 10 1/2 mo; it will provide 150,000 sq ft of floor space immediately, and 50,000 sq ft more in future; floor beams, mostly 16 B 31's and 16 WF 40's, are composite with 4 1/2 in. light weight concrete floor slab; cost data are given, and specific advantages, as compared with bolted connections, are discussed.
Arc welding speeds construction of office building
It is shown how savings in cost and construction time were obtained in recently completed office building by use of arc-welded and composite structural members as compared with all-bolted and non-composite construction; medium-size, three-story building was designed and built within 10 1/2 mo; it will provide 150,000 sq ft of floor space immediately, and 50,000 sq ft more in future; floor beams, mostly 16 B 31's and 16 WF 40's, are composite with 4 1/2 in. light weight concrete floor slab; cost data are given, and specific advantages, as compared with bolted connections, are discussed.
Arc welding speeds construction of office building
Civ Eng (NY)
Fischl, R.F. (author) / Klatte, G. (author)
1965
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Welding speeds bridge construction
Engineering Index Backfile | 1957
|Mechanised welding speeds high rise construction
Tema Archive | 1984
|Welding speeds up line pipe construction
Engineering Index Backfile | 1935
Engineering Index Backfile | 1947
|Tannai Construction Company Office Building