A platform for research: civil engineering, architecture and urbanism
Loon Lake bridge, crossing 50-ft deep canyon with span of 103 ft, is built of 4 laminated arches, hinged at center line; each piece of arch was treated under pressure with Wolman salts before it was glued; bridge carries 20-ft roadway with H-20 loading.
Loon Lake bridge, crossing 50-ft deep canyon with span of 103 ft, is built of 4 laminated arches, hinged at center line; each piece of arch was treated under pressure with Wolman salts before it was glued; bridge carries 20-ft roadway with H-20 loading.
Laminated arch for Oregon bridge
Western Construction News
Fulbright, R.H. (author)
1948
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Oregon steel arch bridge erected by cableway
Engineering Index Backfile | 1926
|Three-hinge timber arch bridge built by CCC in Oregon
Engineering Index Backfile | 1936
|Oregon highway bridge to be built by Freyssinet arch method
Engineering Index Backfile | 1930
Glued-Laminated Timber Arch Bridge Inspection Using UAV
British Library Conference Proceedings | 2019
|