A platform for research: civil engineering, architecture and urbanism
Three-hinge timber arch bridge built by CCC in Oregon
Description of highway bridge of 135-ft arch span designed to make fabrication and erection as simple as possible, built with inexperienced labor on North Umpqua River.
Three-hinge timber arch bridge built by CCC in Oregon
Description of highway bridge of 135-ft arch span designed to make fabrication and erection as simple as possible, built with inexperienced labor on North Umpqua River.
Three-hinge timber arch bridge built by CCC in Oregon
Eng News-Rec
Smith, W.D. (author)
Engineering News-Record ; 117
1936
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Three-hinged arch highway bridge built of timber
Engineering Index Backfile | 1917
|Multiple arch concrete bridge built on timber falsework
Engineering Index Backfile | 1933
|Oregon highway bridge to be built by Freyssinet arch method
Engineering Index Backfile | 1930
Laminated arch for Oregon bridge
Engineering Index Backfile | 1948
|Oregon steel arch bridge erected by cableway
Engineering Index Backfile | 1926
|