A platform for research: civil engineering, architecture and urbanism
Bridge at Marysville, Calif, uses steel girder spans ranging up to 161 ft long, set in place by crawler cranes; 70-ft deck height was required to allow clearance over railroad on top of levee; piers were streamlined, hollow shafts up to flood level, above which two pylons were used; structural features described and illustrated.
Bridge at Marysville, Calif, uses steel girder spans ranging up to 161 ft long, set in place by crawler cranes; 70-ft deck height was required to allow clearance over railroad on top of levee; piers were streamlined, hollow shafts up to flood level, above which two pylons were used; structural features described and illustrated.
High girders bridge feather river
Eng News-Rec
Hutchinson, R.W. (author)
Engineering News-Record ; 139
1947
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1964
|Innovative High Performance Steel Bridge Girders
ASCE | 2001
|Bridge girders set by high-line
Engineering Index Backfile | 1957
|Bridge girders set by high-line
Engineering Index Backfile | 1957
|Engineering Index Backfile | 1928
|