A platform for research: civil engineering, architecture and urbanism
Beach park growing with fill from new Los Angeles sewage plant site
14,000,000 cu yd of sand from site of Hyperion, Calif sewage treatment plant is being used to build up new beach; 30,000 cu yd are pumped every day to fill beach up to 4 ft above high tide; sand dunes are sluiced down with high pressure monitor jets and washed into collection box; Venturi jet in eductor keeps collection box from clogging. (See also Western Construction News v 23 n 5 May 1948 p 97-9)
Beach park growing with fill from new Los Angeles sewage plant site
14,000,000 cu yd of sand from site of Hyperion, Calif sewage treatment plant is being used to build up new beach; 30,000 cu yd are pumped every day to fill beach up to 4 ft above high tide; sand dunes are sluiced down with high pressure monitor jets and washed into collection box; Venturi jet in eductor keeps collection box from clogging. (See also Western Construction News v 23 n 5 May 1948 p 97-9)
Beach park growing with fill from new Los Angeles sewage plant site
Construction Methods
Construction Methods ; 30
1948
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Beach park growing with fill from new Los Angeles sewage plant site
Engineering Index Backfile | 1948
Behavior of beach fill at Virginia Beach, Virginia
Engineering Index Backfile | 1959
|Optimization of Beach Fill Transitions
British Library Conference Proceedings | 1993
|Engineering Index Backfile | 1942
|