A platform for research: civil engineering, architecture and urbanism
Philadelphia conducts extensive subsurface exploration prior to airport expansion
Expansion program for South West Airport calls for grading and draining 175 acres; new 22-gate terminal building, additional hangars and extension of two runways; soils tests showed need for extreme care in placing fills to avoid creation of mud waves; method of constructing fill makes it probable that settlement and consolidation will take place within six mo after completion of overload fill. (NY)
Philadelphia conducts extensive subsurface exploration prior to airport expansion
Expansion program for South West Airport calls for grading and draining 175 acres; new 22-gate terminal building, additional hangars and extension of two runways; soils tests showed need for extreme care in placing fills to avoid creation of mud waves; method of constructing fill makes it probable that settlement and consolidation will take place within six mo after completion of overload fill. (NY)
Philadelphia conducts extensive subsurface exploration prior to airport expansion
Civ Eng
Scott, Jr., E.W. (author)
Civil Engineering ; 18
1948
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
STUDY HAUL New York contractor conducts extensive equipment evaluation to handle job
British Library Online Contents | 2005
British Library Online Contents | 1999
Engineering Index Backfile | 1951
|Forecasts for Philadelphia international airport
Engineering Index Backfile | 1966
|Philadelphia gets a new airport
Engineering Index Backfile | 1945
|