A platform for research: civil engineering, architecture and urbanism
Canadian supersonic wind tunnel
Tunnel completed at Lachine plant of Dominion Bridge Co believed to be most advanced yet constructed in Canada; working section is 10 in. sq, and equipment works on vacuum principle, using 35 ft diam vacuum sphere. (See also Engineer v 192 n 4997 Nov 2 1951 p 571-2)
Canadian supersonic wind tunnel
Tunnel completed at Lachine plant of Dominion Bridge Co believed to be most advanced yet constructed in Canada; working section is 10 in. sq, and equipment works on vacuum principle, using 35 ft diam vacuum sphere. (See also Engineer v 192 n 4997 Nov 2 1951 p 571-2)
Canadian supersonic wind tunnel
Machy (Lond)
Machinery ; 80
1952
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Canadian supersonic wind tunnel
Engineering Index Backfile | 1951
A technique for reducing supersonic transient loads on internal wind tunnel balances
DOAJ | 2024
|Engineering Index Backfile | 1956
|