A platform for research: civil engineering, architecture and urbanism
Canadian supersonic wind tunnel
Tunnel completed at Lachine plant of Dominion Bridge Co believed to be most advanced yet constructed in Canada; working section is 10 in. sq, and equipment works on vacuum principle, using 35 ft diam vacuum sphere. (see also Machy (Lond) v 80 n 2056 Apr 10 1952 p 648-9)
Canadian supersonic wind tunnel
Tunnel completed at Lachine plant of Dominion Bridge Co believed to be most advanced yet constructed in Canada; working section is 10 in. sq, and equipment works on vacuum principle, using 35 ft diam vacuum sphere. (see also Machy (Lond) v 80 n 2056 Apr 10 1952 p 648-9)
Canadian supersonic wind tunnel
Engineer
Engineer ; 192
1951
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Canadian supersonic wind tunnel
Engineering Index Backfile | 1952
A technique for reducing supersonic transient loads on internal wind tunnel balances
DOAJ | 2024
|Engineering Index Backfile | 1956
|