A platform for research: civil engineering, architecture and urbanism
May 1952 n 551 p 387-9: Progress report on road and two viaducts one of them 970 ft long in eleven spans, other 1910 ft including 300 ft plate girder bridge over River Neath. June 1952 n 552 p 490-1: Construction of abutments; erection of steel work.
May 1952 n 551 p 387-9: Progress report on road and two viaducts one of them 970 ft long in eleven spans, other 1910 ft including 300 ft plate girder bridge over River Neath. June 1952 n 552 p 490-1: Construction of abutments; erection of steel work.
Construction of South Wales by-pass road
Civ Eng (Lond)
Hammond, R. (author)
1952
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1948
Road system of New South Wales
Engineering Index Backfile | 1946
|Improvements to the Observational Method in New South Wales Road Tunnel Construction
Springer Verlag | 2023
|Heavy road construction in north wales
Engineering Index Backfile | 1934
|