A platform for research: civil engineering, architecture and urbanism
Old Holyhead main road along Welsh headlands being rebuilt with heavy sidehill cuts, tunnels and masonry viaducts; road will have 27-ft carriage-way, 5-ft footpath on north side and 2-ft sloping verge on south side.
Old Holyhead main road along Welsh headlands being rebuilt with heavy sidehill cuts, tunnels and masonry viaducts; road will have 27-ft carriage-way, 5-ft footpath on north side and 2-ft sloping verge on south side.
Heavy road construction in north wales
Eng News-Rec
Bailey, F.G. (author)
Engineering News-Record ; 112
1934
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of South Wales by-pass road
Engineering Index Backfile | 1952
|Reconstruction of Chester -- Holyhead road near penmaenmawr, north Wales
Engineering Index Backfile | 1937
|Reconstruction of Chester -- Holyhead road near penmaenmawr, north Wales
Engineering Index Backfile | 1937
|Design and construction of a North Wales outfall
British Library Online Contents | 1993
Online Contents | 2000