How to build roof first and dig reservoir later
Construction procedure used at Tustin, Calif, in building 115× 135 ft reservoir of 1,500,000 gal capacity; after site was leveled to grade, 30-in. holes were bored with rotary auger and columns were assembled in reinforcing cages and then poured up to level of drop panel; roof slab was poured on original ground and reservoir was then excavated; drawing shows structural details.
How to build roof first and dig reservoir later
Construction procedure used at Tustin, Calif, in building 115× 135 ft reservoir of 1,500,000 gal capacity; after site was leveled to grade, 30-in. holes were bored with rotary auger and columns were assembled in reinforcing cages and then poured up to level of drop panel; roof slab was poured on original ground and reservoir was then excavated; drawing shows structural details.
How to build roof first and dig reservoir later
Western Construction
Browning, C.R. (author)
Western Construction ; 26
1951
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Roof built first, columns later
Engineering Index Backfile | 1968
Engineering Index Backfile | 1950
Enclose, build : walls, facade, roof
UB Braunschweig | 2015
|Plan your service center now, build later
Tema Archive | 1975
|