A platform for research: civil engineering, architecture and urbanism
Procedure adopted for transferring bearing underground
Procedure simplified by standardization of shaft layout; positioning of collar-set steel; installation of plumbing brackets; placing steadying brackets in shaft; transferring bearing from plumb wires into station; system entails no delay in shaft; diagrams.
Procedure adopted for transferring bearing underground
Procedure simplified by standardization of shaft layout; positioning of collar-set steel; installation of plumbing brackets; placing steadying brackets in shaft; transferring bearing from plumb wires into station; system entails no delay in shaft; diagrams.
Procedure adopted for transferring bearing underground
Inst Mine Surveyors S Africa -- J
Kirby, R. (author) / de Buys, A.J. (author)
1952
12 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Underground Mining Survey: Transferring Traversing and Levelling Measurements
Springer Verlag | 2020
|European Patent Office | 2020
|Newly-added bearing column mounting and roof truss load transferring method
European Patent Office | 2015
|Underground excavation shape optimization using an evolutionary procedure
Online Contents | 2005
|