Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Procedure adopted for transferring bearing underground
Procedure simplified by standardization of shaft layout; positioning of collar-set steel; installation of plumbing brackets; placing steadying brackets in shaft; transferring bearing from plumb wires into station; system entails no delay in shaft; diagrams.
Procedure adopted for transferring bearing underground
Procedure simplified by standardization of shaft layout; positioning of collar-set steel; installation of plumbing brackets; placing steadying brackets in shaft; transferring bearing from plumb wires into station; system entails no delay in shaft; diagrams.
Procedure adopted for transferring bearing underground
Inst Mine Surveyors S Africa -- J
Kirby, R. (Autor:in) / de Buys, A.J. (Autor:in)
1952
12 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Underground Mining Survey: Transferring Traversing and Levelling Measurements
Springer Verlag | 2020
|Europäisches Patentamt | 2020
|Newly-added bearing column mounting and roof truss load transferring method
Europäisches Patentamt | 2015
|Engineering Index Backfile | 1915