A platform for research: civil engineering, architecture and urbanism
Volturno-Garigliano scheme
Particulars of Italian hydroelectric power plant, constructed by Societa Meridionale de Electtricita, with special reference to tunneling work; operations in constructing tunnel which conveys waters from Volturno River to Garigliano; charging and blasting, ventilation and drilling equipment; Rocca d'Evandro and Sant Ambrogio stations will give total production of 131 million kw-hr per yr.
Volturno-Garigliano scheme
Particulars of Italian hydroelectric power plant, constructed by Societa Meridionale de Electtricita, with special reference to tunneling work; operations in constructing tunnel which conveys waters from Volturno River to Garigliano; charging and blasting, ventilation and drilling equipment; Rocca d'Evandro and Sant Ambrogio stations will give total production of 131 million kw-hr per yr.
Volturno-Garigliano scheme
Water Power
Water Power ; 4
1952
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
L'impianto idro-elettrico del Volturno
Engineering Index Backfile | 1917
Cable-stayed bridge over Garigliano
British Library Conference Proceedings | 1994
|Reconstruction of Garigliano bridge (former Auteuil viaduct)
Engineering Index Backfile | 1966
|Garigliano nuclear power plant: seismic evaluation of the turbine building
BASE | 2011
|