A platform for research: civil engineering, architecture and urbanism
Main dam, 245 ft high from Bear River bed, consists of dumped, washed rock fill; reinforced concrete facing, from 12 to 33 in. thick top to bottom, covers upstream slope; high pressure water jet washes out dirt and fines, helps to bed each large rock properly, and fills voids with finer rock particles; concrete facing consists of blocks 60 ft long, and from 25 to 60 ft wide.
Main dam, 245 ft high from Bear River bed, consists of dumped, washed rock fill; reinforced concrete facing, from 12 to 33 in. thick top to bottom, covers upstream slope; high pressure water jet washes out dirt and fines, helps to bed each large rock properly, and fills voids with finer rock particles; concrete facing consists of blocks 60 ft long, and from 25 to 60 ft wide.
Revive rock fill at Bear River
Excavating Engr
Green, R.J. (author)
Excavating Engineer ; 48
1952
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rock fill diverts River at Davis Dam
Engineering Index Backfile | 1948
Rock fill protection of river and canal banks
Engineering Index Backfile | 1963
|Old river project; rock-fill initial closure dam
Engineering Index Backfile | 1959
|Engineering Index Backfile | 1913
|World's largest rock-fill dam built on Dix river
Engineering Index Backfile | 1925
|