A platform for research: civil engineering, architecture and urbanism
Three arches to span 780 feet
Steel falsework of concrete arches for California freeway bridge, having three spans of 230, 319 and 230 ft, is supported on steel towers and girders; highest arch 130 ft from ground level; curvature of arch formed by bending 20 to 24-ft long, 4×6 timbers over blocking; concrete pouring done by power crane with 130-ft boom and 30-ft jib. (see also Eng News-Rec v 148 n 17 Apr 24 1952 p 71-2, 74)
Three arches to span 780 feet
Steel falsework of concrete arches for California freeway bridge, having three spans of 230, 319 and 230 ft, is supported on steel towers and girders; highest arch 130 ft from ground level; curvature of arch formed by bending 20 to 24-ft long, 4×6 timbers over blocking; concrete pouring done by power crane with 130-ft boom and 30-ft jib. (see also Eng News-Rec v 148 n 17 Apr 24 1952 p 71-2, 74)
Three arches to span 780 feet
Western Construction
Western Construction ; 27
1952
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1952
Precast arches for gym span 132 feet
Engineering Index Backfile | 1958
Skewed arches span Berlin arena
Engineering Index Backfile | 1964
Tied arches to Span Mississippi
Engineering Index Backfile | 1940
Reinforced concrete arches of long span
Engineering Index Backfile | 1921
|