A platform for research: civil engineering, architecture and urbanism
Construction of butterbridge diversion aqueducts, Loch Sloy hydro electric project
Methods adopted for intake structures and 9 mi of aqueduct in elevated, steep and rocky terrain with high rainfall; prefabricated shutters employed on open and closed conduits; four types of construction incorporated in aqueducts: open, concrete lined channel, reinforced concrete box conduit, rock tunnel, and reinforced concrete pipe; intakes consist of gravity section weir.
Construction of butterbridge diversion aqueducts, Loch Sloy hydro electric project
Methods adopted for intake structures and 9 mi of aqueduct in elevated, steep and rocky terrain with high rainfall; prefabricated shutters employed on open and closed conduits; four types of construction incorporated in aqueducts: open, concrete lined channel, reinforced concrete box conduit, rock tunnel, and reinforced concrete pipe; intakes consist of gravity section weir.
Construction of butterbridge diversion aqueducts, Loch Sloy hydro electric project
Instn Water Engrs -- J
Fraser, D.D. (author)
1952
20 pages
4 Supp Plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Scottish Hydro-Electric upgrades Loch Sloy
Online Contents | 1995
Risk analysis of construction diversion for hydro project
British Library Conference Proceedings | 2000
|Hydro-electric water-diversion tunnels
Engineering Index Backfile | 1930
|Some notes on construction of aqueducts
Engineering Index Backfile | 1939
|