A platform for research: civil engineering, architecture and urbanism
Finish deep bridge substructure, designed to reduce work under water, month ahead of time
Unusual plant used in building deep foundations. (3500 w.) (71669)
Finish deep bridge substructure, designed to reduce work under water, month ahead of time
Unusual plant used in building deep foundations. (3500 w.) (71669)
Finish deep bridge substructure, designed to reduce work under water, month ahead of time
E R
Cortelyou, Frank M. (author)
1916
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Shaking table tests of a self-centering designed bridge substructure
Elsevier | 2008
|Shaking table tests of a self-centering designed bridge substructure
Online Contents | 2008
|Shaking table tests of a self-centering designed bridge substructure
Online Contents | 2008
|British Library Online Contents | 2000
Substructure work and erection of the shubenacadie bridge
Engineering Index Backfile | 1904