A platform for research: civil engineering, architecture and urbanism
South cantilever arm of Quebec bridge completed
13000 tons of steel erected in 92 days. Erection methods. (Also editorial.) (4700 w.) (72513)
South cantilever arm of Quebec bridge completed
13000 tons of steel erected in 92 days. Erection methods. (Also editorial.) (4700 w.) (72513)
South cantilever arm of Quebec bridge completed
E N
Meyers, A.J. (author)
1916
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Proposed cantilever bridge over the St. Lawrence, Quebec
Engineering Index Backfile | 1885
Multiple cantilever completed at Cairo
Engineering Index Backfile | 1938
|Multiple cantilever completed at Cairo
Engineering Index Backfile | 1938
|Quebec suspended-span hoisting details completed
Engineering Index Backfile | 1916
|