A platform for research: civil engineering, architecture and urbanism
Brief illustrated note on hydroelectric development of Castelo de Bode
Brief illustrated note on hydroelectric development of Castelo de Bode, started in May 1946; concrete arch dam 30 m high; 180-m derivational tunnel 98.22 sq mi in section, delivering 2000 cu m per sec; photographs show construction progress.
Brief illustrated note on hydroelectric development of Castelo de Bode
Brief illustrated note on hydroelectric development of Castelo de Bode, started in May 1946; concrete arch dam 30 m high; 180-m derivational tunnel 98.22 sq mi in section, delivering 2000 cu m per sec; photographs show construction progress.
Brief illustrated note on hydroelectric development of Castelo de Bode
Breve Noticia Sobre o Aproveitamento Hidroelectrico de Castelo de Bode
1948
2 pages
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1949
Construction of Castelo-Do-Bode Dam, Portugal
Engineering Index Backfile | 1949
Concreting plant at Castelo do Bode dam, Portugal
Engineering Index Backfile | 1950
Concreting plant at Castelo do Bode dam, Portugal
Engineering Index Backfile | 1950
Engineering geological studies and design of Castelo do Bode tunnel
British Library Conference Proceedings | 1984
|