A platform for research: civil engineering, architecture and urbanism
Castelo Do Bode Dam
Dam being built in Portugal on Zezere River; mechanical handling equipment used in construction; power which will be obtained from Castelo dam will feed grid system and it is hoped to generate electric power by 1951.
Castelo Do Bode Dam
Dam being built in Portugal on Zezere River; mechanical handling equipment used in construction; power which will be obtained from Castelo dam will feed grid system and it is hoped to generate electric power by 1951.
Castelo Do Bode Dam
Mech Handling
Mechanical Handling ; 36
1949
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Castelo-Do-Bode Dam, Portugal
Engineering Index Backfile | 1949
Concreting plant at Castelo do Bode dam, Portugal
Engineering Index Backfile | 1950
Concreting plant at Castelo do Bode dam, Portugal
Engineering Index Backfile | 1950
Engineering geological studies and design of Castelo do Bode tunnel
British Library Conference Proceedings | 1984
|Brief illustrated note on hydroelectric development of Castelo de Bode
Engineering Index Backfile | 1948