A platform for research: civil engineering, architecture and urbanism
Aspects of economic operation of hydroelectric portion of multiple purpose projects of Bureau of Reclamation; hydroelectric plants are required to produce saleable power from head available without detriment to other purposes of project; revenue from hydroelectric power often represents payout of entire project; turbine capability at design of turbine depends on irrigation demands of project.
Aspects of economic operation of hydroelectric portion of multiple purpose projects of Bureau of Reclamation; hydroelectric plants are required to produce saleable power from head available without detriment to other purposes of project; revenue from hydroelectric power often represents payout of entire project; turbine capability at design of turbine depends on irrigation demands of project.
Multiple purpose powerplant capacity
ASCE -- Proc (J Power Div)
Krueger, R.E. (author)
1959
15 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1961
|Engineering Index Backfile | 1955
powerplant fueled by wastewater
Online Contents | 1994
Morrow point underground powerplant
Engineering Index Backfile | 1965
|