Neither time nor tide tethers St. Lawrance wharf construction
Methods of construction used to complete on 5-mo schedule 1000-ft-long wharf substructure in turbulent St. Lawrence River about 400 mi northeast of Quebec City; portion of cribbing was prefabricated on shore and remainder in wet dock; each unit was floated into position and sunk onto rock mattress at bottom of river. (07095)
Neither time nor tide tethers St. Lawrance wharf construction
Methods of construction used to complete on 5-mo schedule 1000-ft-long wharf substructure in turbulent St. Lawrence River about 400 mi northeast of Quebec City; portion of cribbing was prefabricated on shore and remainder in wet dock; each unit was floated into position and sunk onto rock mattress at bottom of river. (07095)
Neither time nor tide tethers St. Lawrance wharf construction
Eng News-Rec
Engineering News-Record ; 181
1968
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Wharf resists cold, tide extremes
Engineering Index Backfile | 1949
Multipurpose wharf automatically adapting to tide level change
European Patent Office | 2020
|Discussion of “Lawrance and Miller on Sludge Outfall”
ASCE | 2021
|Wharf reconstruction at Levis, Que, hampered by tide conditions
Engineering Index Backfile | 1951