A platform for research: civil engineering, architecture and urbanism
Wharf reconstruction at Levis, Que, hampered by tide conditions
Description of reconstruction work on 715-ft long wharf on St. Lawrence river shore; with working time restricted to 2 to 3-hr per shift by tidal fluctuations, use of special rapid-setting cement helped to speed operations; reconstruction methods used; illustrations.
Wharf reconstruction at Levis, Que, hampered by tide conditions
Description of reconstruction work on 715-ft long wharf on St. Lawrence river shore; with working time restricted to 2 to 3-hr per shift by tidal fluctuations, use of special rapid-setting cement helped to speed operations; reconstruction methods used; illustrations.
Wharf reconstruction at Levis, Que, hampered by tide conditions
Roads Eng Construction
1951
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Wharf resists cold, tide extremes
Engineering Index Backfile | 1949
British Library Online Contents | 1999
Multipurpose wharf automatically adapting to tide level change
European Patent Office | 2020
|Neither time nor tide tethers St. Lawrance wharf construction
Engineering Index Backfile | 1968
Vatia wharf reconstruction, Fiji
Engineering Index Backfile | 1946
|