A platform for research: civil engineering, architecture and urbanism
New Haven solves interesting power plant supply problem
Newly constructed modern pumping plant with total capacity of 180,000 gal. per hr. recently completed in connection with new 140,000,000 gal. reservoir; cost $600,000; difficulties which confronted dam project; dam is 360 ft. long; spillway; pump house provides four separate suction wells.
New Haven solves interesting power plant supply problem
Newly constructed modern pumping plant with total capacity of 180,000 gal. per hr. recently completed in connection with new 140,000,000 gal. reservoir; cost $600,000; difficulties which confronted dam project; dam is 360 ft. long; spillway; pump house provides four separate suction wells.
New Haven solves interesting power plant supply problem
Ry. Age
Railway Age ; 85
1928
5 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Abilene Solves Supply Problem With Microfiltration
Wiley | 2003
|Online Contents | 1997
Engineering Index Backfile | 1960
Water Supply Problem of Lock Haven, Pa.
Wiley | 1961
|Modeling solves ultrahard material problem
British Library Online Contents | 2017
|