A platform for research: civil engineering, architecture and urbanism
Subway construction methods on Central Park West, New York
Cut varies in depth from 38 to 41 ft. is 32 ft. wide between stations, and 42 ft. at stations; by-passing gas pipe; study of excavating methods; excavation procedure; concreting plant.
Subway construction methods on Central Park West, New York
Cut varies in depth from 38 to 41 ft. is 32 ft. wide between stations, and 42 ft. at stations; by-passing gas pipe; study of excavating methods; excavation procedure; concreting plant.
Subway construction methods on Central Park West, New York
Contractors Engrs. Monthly
Groves, E.A. (author)
1928
4 pages
11 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New York electric subway construction methods
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1932
|Subway tunnel construction in New York city
Engineering Index Backfile | 1964
|Subway Tunnel Construction in New York City
ASCE | 2021
|Geotechnical Challenges on the BART Fremont Central Park Subway Project
British Library Conference Proceedings | 2009
|