A platform for research: civil engineering, architecture and urbanism
Description of methods employed to cut off metal sheet piling of cofferdam at Verberie, by means of oxyacetylene blow torch combined with oxy-electric cutting process under water; cost of work.
Description of methods employed to cut off metal sheet piling of cofferdam at Verberie, by means of oxyacetylene blow torch combined with oxy-electric cutting process under water; cost of work.
Cutting off a cofferdam of metal sheet piling 2.5 m. below water level
Recepage d'un batardeau en palplanches metalliques a 2m50 au-dessous du niveau de l'eau
Cor (author)
1928
9 pages
2 Figs.
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
An extensive cofferdam of steel sheet piling
Engineering Index Backfile | 1908
Cutting steel piling below low-water level
Engineering Index Backfile | 1923
|Cutting sheet steel piling under water
Engineering Index Backfile | 1932
|Cutting cofferdam piles at riverbed level
Engineering Index Backfile | 1938