A platform for research: civil engineering, architecture and urbanism
Constructing a sewer tunnel for the Prague municipality
Floor of sewer had to be placed at considerable depth, maximum being 95 ft. below surface; entire section of work was carried out in form of tunnel between three shafts; whole of tunnel was cut through rock; finished tunnel was lined with rammed concrete.
Constructing a sewer tunnel for the Prague municipality
Floor of sewer had to be placed at considerable depth, maximum being 95 ft. below surface; entire section of work was carried out in form of tunnel between three shafts; whole of tunnel was cut through rock; finished tunnel was lined with rammed concrete.
Constructing a sewer tunnel for the Prague municipality
Bohrhammer (English Edition.)
Burian, R. (author)
1928
5 pages
12 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1940
|Constructing small sewer tunnel in rock
Engineering Index Backfile | 1932
|Constructing a large brick-lined sewer tunnel, Brooklyn, N.Y.
Engineering Index Backfile | 1910
Trenchless Sewer Rehabilitation - Regional Municipality of Ottawa-Carleton
British Library Conference Proceedings | 1993
|Sacramento constructing combined sewer
Engineering Index Backfile | 1927
|