A platform for research: civil engineering, architecture and urbanism
Record paving job by Avon lake village
Average of 256 cu. yd. per day for 27 days; construction methods; pavement is reinforced concrete 18 ft. wide and 10-8-10 in. thick; steel forms are used which are oiled before placing concrete.
Record paving job by Avon lake village
Average of 256 cu. yd. per day for 27 days; construction methods; pavement is reinforced concrete 18 ft. wide and 10-8-10 in. thick; steel forms are used which are oiled before placing concrete.
Record paving job by Avon lake village
Pub. Works
Alexander, H.F. (author)
Public Works ; 59
1928
3 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Paving - Record-breaking paver
Online Contents | 1995
Engineering Index Backfile | 1941
Engineering Index Backfile | 1956
Project profiles - Rycote Park Lake, Thame, Oxfordshire; Bristol Harbourside, Avon
Online Contents | 2003
Engineering Index Backfile | 1913
|