A platform for research: civil engineering, architecture and urbanism
Describes construction work on Houston-La Porte road 17.4 mi. long; highway design; construction features; preparation of subgrade; inspection.
Describes construction work on Houston-La Porte road 17.4 mi. long; highway design; construction features; preparation of subgrade; inspection.
Extensive Texas county road project
Am. City
Wise, A.J. (author)
American City ; 38
1928
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Three-course asphalt road in Texas county
Engineering Index Backfile | 1934
|Highway Project F-533, Hardeman County, Texas
NTIS | 1971
Highway Project F-143, Denton County, Texas
NTIS | 1971
Low cost bridge design capitalized in Texas County road program
Engineering Index Backfile | 1950
|