A platform for research: civil engineering, architecture and urbanism
Pulling the cork from a city's bottleneck
How San Francisco opened up its main outlet; total cost $700, 000; 124 ft. right-of-way; construction methods; expansion joints 60 ft. apart; pavement reinforcement; finishing and curing.
Pulling the cork from a city's bottleneck
How San Francisco opened up its main outlet; total cost $700, 000; 124 ft. right-of-way; construction methods; expansion joints 60 ft. apart; pavement reinforcement; finishing and curing.
Pulling the cork from a city's bottleneck
Mun. News
1928
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1933
Engineering Index Backfile | 1898
|
Synthetic ecology : revisiting Mexico City's lakes project.
Revisiting Mexico City's lakes project
DSpace@MIT | 2011
|Online Contents | 2014
|