A platform for research: civil engineering, architecture and urbanism
Removing cork from bottleneck
Description of modern methods of concrete road construction used in widening 3-mi section of Roosevelt Road, 30 mi west of Chicago.
Removing cork from bottleneck
Description of modern methods of concrete road construction used in widening 3-mi section of Roosevelt Road, 30 mi west of Chicago.
Removing cork from bottleneck
Roads Streets
Roads and Streets ; 76
1933
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pulling the cork from a city's bottleneck
Engineering Index Backfile | 1928
Springer Verlag | 2014
|Thermogravimetric analysis of cork and cork components from Quercus variabilis
British Library Online Contents | 2018
|Wiley | 2024
|Wiley | 2024
|