A platform for research: civil engineering, architecture and urbanism
Foothill Boulevard, near San Nardino California
Reconstruction of state highway includes widening and resurfacing with asphaltic concrete; mixing plant; coarse sand delivered to plant by truck; widening old 18-ft. pavement to 30 ft. involves construction of 6 in. asphaltic concrete shoulder on each side; cost of this work amounts to $20,213 per mile.
Foothill Boulevard, near San Nardino California
Reconstruction of state highway includes widening and resurfacing with asphaltic concrete; mixing plant; coarse sand delivered to plant by truck; widening old 18-ft. pavement to 30 ft. involves construction of 6 in. asphaltic concrete shoulder on each side; cost of this work amounts to $20,213 per mile.
Foothill Boulevard, near San Nardino California
West Constr. News
1928
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Foothill Dormitories: University of California, Berkeley/William Turnbull Associates
British Library Online Contents | 1993
|Improvement of Beverly Boulevard, Montebello, California
Engineering Index Backfile | 1928
|Vom Boulevard Périphérique zum Boulevard Central?
Taylor & Francis Verlag | 2017
|Foothill Dormitories - University of California, Berkeley-William Turnbull Associates
Online Contents | 1993
|Foothill freeway: headache road
Engineering Index Backfile | 1954
|