A platform for research: civil engineering, architecture and urbanism
New freeway from La Canada to Pasadena, complete with four divided lanes and center esplanade, will promote crooked highway to full freeway status; six bridges called for, largest will be 418 ft across Arroyo Seco; types of earth moving equipment used, fill compaction; crane equipment on concrete; typical work stages illustrated.
New freeway from La Canada to Pasadena, complete with four divided lanes and center esplanade, will promote crooked highway to full freeway status; six bridges called for, largest will be 418 ft across Arroyo Seco; types of earth moving equipment used, fill compaction; crane equipment on concrete; typical work stages illustrated.
Foothill freeway: headache road
Excavating Engr
Day, R. (author)
Excavating Engineer ; 48
1954
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Foothill Boulevard, near San Nardino California
Engineering Index Backfile | 1928
Works - Changing Perspectives - Foothill Mountain Observatory: Reconsidering Golden Mountain
Online Contents | 1998
|Foothill Dormitories: University of California, Berkeley/William Turnbull Associates
British Library Online Contents | 1993
|FILTERING ABSTRACTION INTAKE ON MOUNTAIN AND FOOTHILL RIVER PARTS
European Patent Office | 2017
|Online Contents | 2000
|