A platform for research: civil engineering, architecture and urbanism
Burrator reservoir enlargement
Brief account of work of raising water level of Burrator Reservoir; in carrying out work, bridge conveying road over Burrator dam and considerable portion of dam itself had to be taken out; new bridge is of granite and consists of five segmental arches; works have been in progress 4 1/2 years and are now completed.
Burrator reservoir enlargement
Brief account of work of raising water level of Burrator Reservoir; in carrying out work, bridge conveying road over Burrator dam and considerable portion of dam itself had to be taken out; new bridge is of granite and consists of five segmental arches; works have been in progress 4 1/2 years and are now completed.
Burrator reservoir enlargement
Engineer
Engineer ; 146
1928
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
Judy Reservoir Enlargement Project
British Library Conference Proceedings | 1999
|Enlargement of "Sveden" reservoir
Engineering Index Backfile | 1953
|Eildon reservoir enlargement project, Victoria
Engineering Index Backfile | 1948
|Sulphur Creek dam and reservoir enlargement
British Library Conference Proceedings | 1994
|