A platform for research: civil engineering, architecture and urbanism
When extending existing 88,000 cu ft concrete reservoir to 350,000 cu ft at Solna, suburb of Stockholm, casting of supporting columns was carried out by means of hydraulically operated slide form about 92 ft high; for transport of material within building, revolving crane with lifting capacity of 1. 5 tons was used.
When extending existing 88,000 cu ft concrete reservoir to 350,000 cu ft at Solna, suburb of Stockholm, casting of supporting columns was carried out by means of hydraulically operated slide form about 92 ft high; for transport of material within building, revolving crane with lifting capacity of 1. 5 tons was used.
Enlargement of "Sveden" reservoir
Utvidgning av Svedenreservoaren
Evers, G. (author)
Betong ; 38
1953
10 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
Burrator reservoir enlargement
Engineering Index Backfile | 1928
Judy Reservoir Enlargement Project
British Library Conference Proceedings | 1999
|Eildon reservoir enlargement project, Victoria
Engineering Index Backfile | 1948
|Sulphur Creek dam and reservoir enlargement
British Library Conference Proceedings | 1994
|