A platform for research: civil engineering, architecture and urbanism
Concrete piles spliced with a quick-hardening concrete
Job of splicing 24 concrete piles carried out by Oklahoma State Highway Department on 80-ft. three-span, I-beam bridge, just east of Stillwater; forms removed from splices two days after pouring; first pile driven when nine days old; all joints held.
Concrete piles spliced with a quick-hardening concrete
Job of splicing 24 concrete piles carried out by Oklahoma State Highway Department on 80-ft. three-span, I-beam bridge, just east of Stillwater; forms removed from splices two days after pouring; first pile driven when nine days old; all joints held.
Concrete piles spliced with a quick-hardening concrete
Eng. News-Rec
Conrow, A.D. (author)
Engineering News Record ; 101
1928
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Driving of spliced reinforced-concrete piles
Engineering Index Backfile | 1928
|Corrosion protection of precast concrete spliced piles
British Library Conference Proceedings | 1993
|Spliced concrete piles fill offshore construction gap
Engineering Index Backfile | 1961
|