A platform for research: civil engineering, architecture and urbanism
50-ft. Concrete bridge piles driven six days after pouring
Illinois state highway department uses high-early-strength concrete to prevent delay on Illinois River bridge; cross-section of bridge; method of driving piles.
50-ft. Concrete bridge piles driven six days after pouring
Illinois state highway department uses high-early-strength concrete to prevent delay on Illinois River bridge; cross-section of bridge; method of driving piles.
50-ft. Concrete bridge piles driven six days after pouring
Eng. News-Rec
Farmer, H.G. (author)
Engineering News Record ; 101
1928
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete pouring device for bridge construction and pouring method
European Patent Office | 2023
|