A platform for research: civil engineering, architecture and urbanism
Mississippi river. Developing new methods of levee construction
Describes method developed by Canal Construction Co., of Chicago and Memphis, known as Shea method of building levee embankment; method required rehandling dirt.
Mississippi river. Developing new methods of levee construction
Describes method developed by Canal Construction Co., of Chicago and Memphis, known as Shea method of building levee embankment; method required rehandling dirt.
Mississippi river. Developing new methods of levee construction
Earth Mover
Earth Mover ; 15
1928
2 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Levee construction along the Mississippi River
Engineering Index Backfile | 1929
|Construction methods and plant on Mississippi levee construction
Engineering Index Backfile | 1929
|Levee construction on Mississippi and its effect on river section
Engineering Index Backfile | 1920
|The Levee theory on the Mississippi River
Engineering Index Backfile | 1903
The Levee theory on the Mississippi River
Engineering Index Backfile | 1903